Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed: Observed the placement of fill for sections of roadway today. Compaction tests were performed using a nuclear density gauge. Overall, the results of density testing confirmed that fill compaction met the project and ASTM requirements. Results are attached in separate reports. A temporary pond filled with water located adjacent to Lot#70 (and roadway) was observed by Ram Mogulla of ASEC for subgrade stability for further fill placement. A 7-foot test pit displayed unsuitable materials. A proof-roll was also performed and showed pumping and rutting indicating underlying wet soil. Following a discussion with the grading contractor, the grading contractor agreed to drain away excess water, demuck soft soils and then begin fill placement in the specified area. For more detail, please see the attached pictures. Please contact us if you have any questions regarding this report or of the density test results.
Upload Images
Image
Description
1
The road at sbgrade
2
The location after test pit investigation and proof role where backfill was suggested
3
The test pit where unwanted materials were observed
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel