Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed: Observed the placement of fill/grading for Lots #106, 119 and #120 today. Compaction tests were performed using a nuclear density gauge. Overall, the results of density testing confirmed that fill compaction met the project and ASTM requirements. Results are attached in separate reports. Filling also continued for the originally low-lying topography for the road and the building pads. This is 15.00 feet backfill, which is a lot and three lifts of backfill was done through the day. The soils are coming from the neighboring building pad cuts and the moisture is close to optimum to a few points over optimum. Please contact us if you have any questions regarding this report or of the density test results.
Upload Images
Image
Description
1
Picture showing the entire and specific cut and fill areas
2
Specifically 195x80 square feet area of back fill
3
Haulig big truck
4
A heavy bulldozer machine which aggressively spread hauled dirt
5
The heavy-duty rolling machine
6
Excaviting heavy-duty machine
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel