Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed: Observed the placement of fill/grading for Lots #73 and #111 today. Compaction tests were performed using a nuclear density gauge. The fill soils placed on Lot #73 were found to be too high in moisture and resulted in failing compaction tests. We recommend scarifying, aerating and recompaction in this area. A shallow excavation was made in one of the cut areas and the fill obtained from this area was placed and compacted on Lot #111. These soils were found to be closer to optimum moisture content and more workable. Results are attached in separate reports. Please contact us if you have any questions regarding this report or of the density test results.
Upload Images
Image
Description
1
Picture showing a 77x45 sq ft backfill lot
2
Storm line pipe put on a packed dirt
3
The trench for the storm line pipe being packed by trench roller
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel