Daily Field Report
Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed: Observed the placement of fill/grading for Lot #114 today. Compaction tests were performed using a nuclear density gauge. Overall, the results of density testing confirmed that fill compaction met the project and ASTM requirements. Results are attached in separate reports. In place moisture contents are still much higher than 3 percent over optimum moisture content. These soils need to spread out and aerated prior to fill placement. Contractor has elected to go to placing thinner lifts with compaction testing at 6-inch intervals while these soils remain wet. Please contact us if you have any questions regarding this report or of the density test results.
Upload Images
Image
Description
1
Picture showing the backfill area with 6.0' more fill
2
The backfill area with more than 8.0' more fill
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel