Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C297(Stratford @ Nature Walk - Footing Inspections)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
vamsi.polisetty@asec-na.com (Vamsi Polisetty)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Nature walk: Footings Inspection (Lot #1013) <ol> <li><strong>Steel Inspection</strong>: The steel reinforcement within the footings was visually inspected for size spacing and quantity. Our representative found that the in-place rebar was found to meet job specifications for size, spacing and quantity.</li> <li>In addition, the area around the footings was also visually inspected to ensure that the soil beneath the footing showed no evidence of loose or wet soils.</li> </ol> (Lot 1007) <ol> <li><strong>Helical Pile Placement</strong>: The helical piles were confirmed to be placed at the specified intervals of every 8 feet within the footings. The contractor appeared to have installed the piles as per job specifications & drawings.</li> </ol> Nature walk: Fill placement for Lots #1ooo, #1001, #1002, #1003, #1004, #1005 and #1006 continued this day. <div class="group/conversation-turn relative flex w-full min-w-0 flex-col agent-turn"> <div class="flex-col gap-1 md:gap-3"> <div class="flex max-w-full flex-col flex-grow"> <div class="min-h-8 text-message flex w-full flex-col items-end gap-2 whitespace-normal break-words text-start [.text-message+&]:mt-5" dir="auto" data-message-author-role="assistant" data-message-id="e96cb548-a371-4937-801d-7fa182fcb4fd" data-message-model-slug="gpt-4o-mini"> <div class="flex w-full flex-col gap-1 empty:hidden first:pt-[3px]"> <div class="markdown prose w-full break-words dark:prose-invert light"> <ul> <li>The contractor utilized a Komatsu D85EX bulldozer to perform the cutting of the slopes and general grading.</li> <li>In addition, a Komatsu PC210 LC excavator was employed for stone breaking operations. Equipped with a hydraulic hammer, the excavator was used to break large rocks and boulders encountered on the site.</li> </ul> </div> </div> </div> </div> </div> </div> We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you <div class="thumb_view"> <div class="row"> <div class="col-md-4 col-sm-6"> <div class="upload_images_items"></div> </div> </div> </div>
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel