Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
<blockquote>Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed: <p style="text-align: justify;">There was no undercutting and/or backfilling during the day.</p> <p style="text-align: justify;">Early moisture content tests show 32.1% and it was suggested to scarify, aerate prior to recompacting.</p> In addition, the retention wall footing preparation began this day. However, the footing location was very wet and was found to have visible organics. The footing will need to be addressed prior to a formal footing inspection for soil bearing strength and concrete placement. Please contact us if you have any questions regarding this report or of the density test results. Ram will talk to the project engineer and will fix later.</blockquote>
Upload Images
Image
Description
1
Picture depicting scarifying of lots 114 and 115
2
Picture shows lots 114 & 115 scarified and repacked
3
A 7' hole dug within the retention wall footing shows still soft and with organic matter
4
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel