Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
<p style="text-align: justify">The down cutting ad backfill a activity was done for a while, but stopped due to high mixture content and allow compaction. Nuclear gauge test shows 32% moisture and way belolow 95% compaction. As a result tilling and scarification was proposed and backfill is stopped for a while.</p> <ul> <li>After scarification, the dirt was spread and packed.</li> </ul> Then another backfill was done for the road way. Another dirt was dug a and was i n good moisture and high compaction of 99% was observed.
Upload Images
Image
Description
1
2
Scarfied to drop the moisture and repack
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel