Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed: Observed cutting and fill placement throughout the day from nearby roadway and other cut areas. Grade work completed using a 349E CAT excavator and two heavy duty dump trucks (745C). Fill was spread and compacted by a 61Ppxi Komatsu Bulldozer and 815F CAT roller, respectively. The Nuclear gauge test showed moisture ranging 23-28% and compaction ranging 95.1%-100%. Moreover, proof-rolling displayed no severe pumping or rutting. In addition, approximately 150 feet of sewer line trench was excavated and placed with backfilling beginning tomorrow. The sewer line trench was excavated between Manholes E1 and E2. Please contact us if you have any questions regarding this report or of the density test results.
Upload Images
Image
Description
1
Picture depicting building pads and roadway under backfill
2
A sewer line trench between Manholes E1 & E2
3
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel