Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed: Cutting and backfill operations continued today using a 349E CAT Excavator and hauling using two heavy duty 745C tandem-axled dump trucks. Fill was spread by a 61Pxi Komatsu Bulldozer for a thin strip behind Lots #28 and #29, specifically on the temporary pond at the back of Lot #30. Compaction was performed using a 815F CAT Roller. Density tests results indicate that several areas fell just short of 95% compaction of a standard proctor, however, these areas were proof-rolled and found to be stable (no severe pumping/rutting was observed). Storm line between Manhole E1 & E2 was excavated and installed. Sewer line between E2 & E3 was installed. Both lines will be backfilled tomorrow. Please contact us if you have any questions regarding this report or of the density test results.
Upload Images
Image
Description
1
Picture showing dip storm line, not backfilled
2
Photo depicting un filled Sewer line
3
Thin strip on the backside of lots, specially at the temporary pond
4
After backfilling of several lifts
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel