Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed: The contractor's plan for today was continue filling the backside of Lots #27 through #31. However, the superintendent changed the plan and proceeded with topsoil hauling. Storm lines between Manholes E2 and E1 were backfilled and compacted. General probing using a 3/8" diameter probe rod showed this area to be stable. Sewer lines between Manholes E2 and E3 was planned to be backfilled but was not completed today. Please contact us if you have any questions regarding this report or of the density test results.
Upload Images
Image
Description
1
Picture depicting top soil hauling and filling on the green are behind the lots
2
Picture showing storm line stretched between Manholes E2/and E1
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel