Daily Field Report
Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
<h3><strong>Observations</strong></h3> The above mentioned AS Engineering & Consulting (ASEC) representative arrived on-site to observe field activities. The following tasks were performed: <h3><strong>Earthwork Activities</strong></h3> The <strong>cut and backfill</strong> activities proceeded throughout the day under favorable weather conditions. The cut was performed using a <strong>349E CAT Excavator</strong>, sourcing material from a nearby cut location. Routine hauling was carried out by <strong>two heavy-duty 745C Loading trucks</strong>. <h3><strong>Backfilling and Compaction</strong></h3> Backfilling operations continued on <strong>Lots #26 through #30 (backside)</strong>, a process initiated last Monday. A <strong>61Pxi Komatsu Bulldozer</strong> was used for backfilling, and <strong>compaction</strong> was performed with an <strong>815F CAT Roller</strong>. <strong>Density test results</strong> confirmed that compaction met job specifications for <strong>95% compaction of a standard proctor</strong>. Additionally, <strong>proof-rolling and general probing</strong> verified the stability of these areas. <h3><strong>Utility Backfilling</strong></h3> The <strong>sewer lines between Manholes E2 & E3</strong> were <strong>backfilled today</strong>. <strong>Density test results</strong> again met the required <strong>95% compaction of a standard proctor</strong>, and stability was confirmed through <strong>proof-rolling and general probing</strong>.
Upload Images
Image
Description
1
Picture depicting backfilled area at Lots 26-30
2
Sewer Line backfilled and compacted between Manholes E2 and E3
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel