Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed: Observed cutting and fill placemen activities as performed by a 349E CAT excavator and hauled using 745C tandem-axled dump tracks. Soils were spread by a 61Pxi Komatsu Bulldozer and compaction using an 815F CAT Roller. Compaction did not meet job specifications. The contractor was informed, and the area was recompacted with some improvement in compaction testing. However, this area still requires additional effort to meet job specifications. Please contact us if you have any questions regarding this report or of the density test results. <blockquote> </blockquote>
Upload Images
Image
Description
1
Backfilled, rolled and re-rolled to improve compaction.
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel