Daily Field Report
Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
Our AS Engineering & Consulting (ASEC) representative arrived on site to observe field activities. The following tasks were performed: Observed the placement of backfill for the sewer line between manholes B9 and B-10 today. During excavation and pipe placement, groundwater water was observed to be seeping into the excavation. It was recommended to remove any soft soils followed by the placement of No. 57 stone to begin out of the bottom of the trench. Please contact us if you have any questions regarding this report or of the density test results.
Upload Images
Image
Description
1
Sewer line b/n Manholes B9 and B10
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel