Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C202(Old Griffin Rd - Hawthorne Reserve)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
The downcutt and backfilling activities were carried out as usual for the day. The downcutt is in a close by cut area and is done by the 349E CAT Excavator. The two heat duity 745C Loading Truck did hauling of first from cut area to the backfill area. The back fill location is at Lots# 48 & 49. The 61Pxi Komatsu Bulldozer spread the hauled dirt whereas the 815F sheet foot CAT Roller compacted the dirt. Nuclear gauge test shows 95% compaction and slightly higher moisture to the optimum. However, proof rolling shows no pumping suggesting good compaction. The total area of backfill for the day is 160x100 square feet.
Upload Images
Image
Description
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel