Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C146(Greene Farms Subdivision)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
<p class="" data-start="114" data-end="427">As requested, a representative from AS Engineering and Consulting (ASEC) visited the project site to perform quality control inspection and testing services. Visual observation techniques were utilized to verify compliance with project drawings, specifications, applicable codes, and approved material submittals.</p> <p class="" data-start="429" data-end="446"><strong data-start="429" data-end="446">Observations:</strong></p> <p class="" data-start="448" data-end="785">During the visit, it was observed that the contractor was in the process of removing approximately 2.5 feet of topsoil. This exceeded the anticipated removal depth. The contractor was notified of the discrepancy and was advised to limit topsoil removal to a depth between 10 inches and 12 inches, in accordance with project requirements.</p> <p class="" data-start="787" data-end="1009">We appreciate the opportunity to provide services on this project. Should you have any questions or need further clarification regarding this report, please do not hesitate to contact us. We would be pleased to assist you.</p>
Upload Images
Image
Description
1
2
3
4
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel