Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C146(Greene Farms Subdivision)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
<p data-start="173" data-end="555">As requested, the site was visited by our <strong data-start="215" data-end="255">AS Engineering and Consulting (ASEC)</strong> representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes, and material submittals. The following observations were made on site during the day:</p> <ul data-start="557" data-end="1367"> <li data-start="557" data-end="677"> <p data-start="559" data-end="677"><strong data-start="559" data-end="589">Excavation and backfilling</strong> activities were carried out during the day, specifically on <strong data-start="650" data-end="674">Lots 103 through 110</strong>.</p> </li> <li data-start="678" data-end="814"> <p data-start="680" data-end="814">Excavation was performed using a <strong data-start="713" data-end="735">CAT 349E excavator</strong>, and hauling operations were conducted using <strong data-start="781" data-end="811">heavy-duty all-road trucks</strong>.</p> </li> <li data-start="815" data-end="898"> <p data-start="817" data-end="898">A <strong data-start="819" data-end="846">Komatsu 61Pxi bulldozer</strong> was utilized for spreading the backfill material.</p> </li> <li data-start="899" data-end="962"> <p data-start="901" data-end="962"><strong data-start="901" data-end="915">Compaction</strong> was performed using a <strong data-start="938" data-end="959">sheepsfoot roller</strong>.</p> </li> <li data-start="963" data-end="1064"> <p data-start="965" data-end="1064">The <strong data-start="969" data-end="983">first lift</strong> of backfill was placed and compacted over the bridge area within Lots 103–110.</p> </li> <li data-start="1065" data-end="1215"> <p data-start="1067" data-end="1215">Due to this, <strong data-start="1080" data-end="1105">nuclear gauge testing</strong> was not conducted on the first lift. Testing will be performed during the placement of the <strong data-start="1197" data-end="1212">second lift</strong>.</p> </li> <li data-start="1216" data-end="1367"> <p data-start="1218" data-end="1367">However, <strong data-start="1227" data-end="1245">manual probing</strong> throughout the area indicated that compaction of the first lift is satisfactory and appears to meet project requirements.</p> </li> </ul> <p data-start="1369" data-end="1571">We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.</p>
Upload Images
Image
Description
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel