Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C146(Greene Farms Subdivision)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
<p data-start="185" data-end="567">As requested, the site was visited by our <strong data-start="227" data-end="267">AS Engineering and Consulting (ASEC)</strong> representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes, and material submittals. The following observations were made on site during the day:</p> <ul data-start="569" data-end="1397"> <li data-start="569" data-end="628"> <p data-start="571" data-end="628">Excavation and backfilling activities were carried out.</p> </li> <li data-start="629" data-end="737"> <p data-start="631" data-end="737">Excavation was performed at the site, and additional fill material was imported from an external source.</p> </li> <li data-start="738" data-end="865"> <p data-start="740" data-end="865">Hauling of imported material was conducted using <strong data-start="789" data-end="804">dump trucks</strong>, while on-site hauling was done using <strong data-start="843" data-end="862">off-road trucks</strong>.</p> </li> <li data-start="866" data-end="1004"> <p data-start="868" data-end="1004">Excavation operations were executed using a <strong data-start="912" data-end="934">CAT 349E excavator</strong>, and a <strong data-start="942" data-end="969">Komatsu 61Pxi bulldozer</strong> was used for spreading the fill.</p> </li> <li data-start="1005" data-end="1091"> <p data-start="1007" data-end="1091"><strong data-start="1007" data-end="1021">Compaction</strong> of the backfilled areas was conducted using a <strong data-start="1068" data-end="1088">sheepfoot roller</strong>.</p> </li> <li data-start="1092" data-end="1268"> <p data-start="1094" data-end="1268"><strong data-start="1094" data-end="1127">Moisture and compaction tests</strong> were performed for all lots using a <strong data-start="1164" data-end="1181">nuclear gauge</strong>. All test results indicated compaction levels exceeding the required specifications.</p> </li> <li data-start="1269" data-end="1397"> <p data-start="1271" data-end="1397">A <strong data-start="1273" data-end="1292">check plug test</strong> was also conducted to verify the correct Proctor value, confirming compliance with project requirements.</p> </li> </ul> <p data-start="1399" data-end="1601">We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.</p>
Upload Images
Image
Description
1
Picture depicting the entire backfill area
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel