Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C217(Naturewalk - 7 Hills Amenities)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
As requested, a representative from AS Engineering and Consulting (ASEC) visited the site to conduct quality control inspections and testing services. Visual observation techniques were employed to verify compliance with project drawings, specifications, applicable codes, and approved material submittals. <h3><strong>Observations from the Site Visit:</strong></h3> <ol start="1"> <li><strong>Earthwork Activities:</strong> Work was in progress in the following areas: <ul> <li>Storm trench between MHC5 and MHC6.</li> <li>Water line at the entrance.</li> </ul> </li> </ol> Upon arrival, our representative observed active work on-site. However, the contractor did not bench back the trench or provide an iron safety box. As a result, the county inspector halted work for the day. Consequently, fill placement was not performed, and testing was not performed. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel