Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C149(Grove at E. Thompson Mill Rd)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
As requested, a representative from AS Engineering and Consulting (ASEC) visited the site to provide quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings, specifications, applicable codes, and material submittals. The following observations were made on-site today: <ul> <li>The placement and compaction of backfill for the outlet control structures in pond-1 and pond 2 continued.</li> <li>Upon arrival, our representative observed that pipe placement was in progress, with six-inch lifts being placed and compacted using jumping and trench compaction equipment. Compaction testing was performed along with general probing using a 3/8-inch diameter probe rod.</li> </ul> We appreciate the opportunity to serve you on this project. If you have any questions regarding this report, please feel free to contact us—we would be happy to discuss it with you.
Upload Images
Image
Description
1
2
3
4
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel