Daily Field Report
Density test report
Date
*
Project Number
*
2025C146(Greene Farms Subdivision)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
solomon.cherie (Solomon Cherie)
Observations/Finding
Summary
*
<p data-start="186" data-end="568">As requested, the site was visited by our <strong data-start="228" data-end="268">AS Engineering and Consulting (ASEC)</strong> representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes, and material submittals. The following observations were made on site during the day:</p> <ul data-start="570" data-end="2147"> <li data-start="570" data-end="807"> <p data-start="572" data-end="807"><strong data-start="572" data-end="602">Excavation and backfilling</strong> activities were carried out throughout the day. Excavation was performed within the site from cut areas, and additional fill material was imported from an external source using <strong data-start="780" data-end="804">multiple dump trucks</strong>.</p> </li> <li data-start="808" data-end="937"> <p data-start="810" data-end="937">Excavation was performed using a <strong data-start="843" data-end="865">CAT 349E excavator</strong>, and internal hauling was carried out using <strong data-start="910" data-end="934">845C all-road trucks</strong>.</p> </li> <li data-start="938" data-end="1084"> <p data-start="940" data-end="1084">The imported and excavated material was spread using a <strong data-start="995" data-end="1022">Komatsu 61Pxi bulldozer</strong>, and compaction was completed with a <strong data-start="1060" data-end="1081">sheepsfoot roller</strong>.</p> </li> <li data-start="1086" data-end="1303"> <p data-start="1088" data-end="1150">Backfilling occurred in <strong data-start="1112" data-end="1126">Lots 29–31</strong> and <strong data-start="1131" data-end="1147">Lots 103–110</strong>:</p> <ul data-start="1153" data-end="1303"> <li data-start="1153" data-end="1217"> <p data-start="1155" data-end="1217"><strong data-start="1155" data-end="1169">Lots 29–31</strong> were backfilled up to <strong data-start="1192" data-end="1214">subgrade elevation</strong>.</p> </li> <li data-start="1220" data-end="1303"> <p data-start="1222" data-end="1303"><strong data-start="1222" data-end="1238">Lots 103–110</strong> were backfilled to approximately <strong data-start="1272" data-end="1302">6 to 7 feet below subgrade</strong>.</p> </li> </ul> </li> <li data-start="1305" data-end="1820"> <p data-start="1307" data-end="1370"><strong data-start="1307" data-end="1341">Nuclear gauge compaction tests</strong> were performed as follows:</p> <ul data-start="1373" data-end="1820"> <li data-start="1373" data-end="1453"> <p data-start="1375" data-end="1453"><strong data-start="1375" data-end="1385">Lot 29</strong> achieved <strong data-start="1395" data-end="1413">98% compaction</strong>, meeting project requirements (Pass).</p> </li> <li data-start="1456" data-end="1701"> <p data-start="1458" data-end="1701"><strong data-start="1458" data-end="1476">Lots 30 and 31</strong> recorded <strong data-start="1486" data-end="1512">89% and 91% compaction</strong>, respectively, which do <strong data-start="1537" data-end="1549">not meet</strong> the required specifications (Fail). The foreman was promptly notified, and rework has been scheduled. Retesting will be conducted in the coming days.</p> </li> <li data-start="1704" data-end="1820"> <p data-start="1706" data-end="1820"><strong data-start="1706" data-end="1722">Lots 103–110</strong> showed compaction values ranging from <strong data-start="1761" data-end="1776">98% to 100%</strong>, indicating that all tests have <strong data-start="1809" data-end="1819">passed</strong>.</p> </li> </ul> </li> <li data-start="1822" data-end="1960"> <p data-start="1824" data-end="1960"><strong data-start="1824" data-end="1841">Water removal</strong> was performed from a <strong data-start="1863" data-end="1881">temporary pond</strong> on site. The area was then <strong data-start="1909" data-end="1959">reinforced with rocks and backfilled with dirt</strong>.</p> </li> <li data-start="1962" data-end="2147"> <p data-start="1964" data-end="2147">Additionally, the <strong data-start="1982" data-end="2004">grading contractor</strong> placed <strong data-start="2012" data-end="2027">wet topsoil</strong> in the backyard areas of <strong data-start="2053" data-end="2069">Lots 103–110</strong>, in accordance with the instructions issued by the grading company’s manager.</p> </li> </ul> <p data-start="2149" data-end="2351">We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.</p>
Upload Images
Image
Description
1
Picture depicting Lots 29-31 backfilled to subgrade
2
Picture showing both backfilled lots and backyards
3
Picture depicting backfilling and reinforcing of old pond with rocks and dirt
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel