Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C217(Naturewalk - 7 Hills Amenities)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
<p data-start="83" data-end="452">As requested, our AS Engineering and Consulting (ASEC) representative visited the site to provide quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings and specifications, applicable codes, and approved material submittals. The following observations were made on site during this visit:</p> <p data-start="454" data-end="753">Work was in progress on the water line at the entrance, as well as in the parking lots and on the slope. No testing was performed on this day. One crew was excavating the water line trench and drilling through rock, while a second crew was leveling the parking lots and continuing work on the slope.</p> <p data-start="755" data-end="948">We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We would be happy to discuss it with you.</p>
Upload Images
Image
Description
1
2
3
4
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel