Daily Field Report
Density test report
Date
*
Project Number
*
2024C217(Naturewalk - 7 Hills Amenities)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Safi Momand (Safiullah Momand)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. <p data-start="260" data-end="345">On the mentioned date, the following activities were in progress at the project site:</p> <ol data-start="347" data-end="597"> <li data-start="347" data-end="478"> <p data-start="350" data-end="478">Placement of the first layer of Graded Aggregate Base (GAB) with an 8-inch thickness over the subgrade for the west deceleration lane.</p> </li> <li data-start="479" data-end="537"> <p data-start="482" data-end="537">Excavation work for the access road to the project site.</p> </li> <li data-start="538" data-end="597"> <p data-start="541" data-end="597">Installation of the stormwater inlet for the access road.</p> </li> </ol> <p data-start="599" data-end="630"><strong data-start="599" data-end="630">Observations by the Writer:</strong></p> <ol data-start="632" data-end="796"> <li data-start="632" data-end="722"> <p data-start="635" data-end="722">The subgrade at the deceleration lane displayed soft materials at two specific locations.</p> </li> <li data-start="723" data-end="796"> <p data-start="726" data-end="796">The backfill around the stormwater inlet appeared not to be adequately compacted.</p> </li> </ol> <p data-start="798" data-end="832"><strong data-start="798" data-end="832">Recommendations by the Writer:</strong></p> <p data-start="834" data-end="995">a. Excavate and remove the soft material at the identified points of the deceleration lane up to a depth of 8 inches, then replace with compacted GAB material. This problem was resolved by the contractor while on site.</p> <p data-start="997" data-end="1173">b. Properly compact the backfill surrounding the stormwater inlet in layers, using a jumping compactor or other suitable equipment.</p> <p data-start="997" data-end="1173">Note: The east site deceleration GAB was placed last week and tested for density by Mr. Clyde Smith. Also, the proof-roll was performed earlier, with the county and construction contractor in attendance, for the west deceleration lane.</p> We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
The deceleration Lane proof roll week point
2
GAB work on declaration line west
3
proof role by county on the exiting entrance road
4
Storm water week backfill
5
The deceleration Lane proof roll week point
6
proof role by county on the exiting entrance road
7
Compacted GAB 8 inches compacted at deceleration line west
8
Compaction test performed on GAB east
9
GAB work on declaration line west
10
GAB work on declaration line west
11
GAB work on declaration line west
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel