Density test report
Date
*
Project Number
*
2024C217(Naturewalk - 7 Hills Amenities)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Safi Momand (Safiullah Momand)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes and material submittals. The following observations were observed on the site this day. <p data-start="64" data-end="87"><strong data-start="64" data-end="87">Ongoing Activities:</strong></p> <ul data-start="89" data-end="385"> <li data-start="89" data-end="281"> <p data-start="91" data-end="281">Undercutting of unsuitable soils (as instructed by ASEC for a 4-inch undercut on July 16, 2025) and backfilling with Graded Aggregate Base (GAB) along Shelly Boulevard continued.</p> </li> <li data-start="282" data-end="385"> <p data-start="284" data-end="385">Curb removal and placement of GAB in the excavated section of the deceleration lane on the west side.</p> </li> </ul> <p data-start="387" data-end="424"><strong data-start="387" data-end="424">Observations and Recommendations:</strong></p> <p data-start="426" data-end="633">The writer visually inspected all four locations where a 4-inch undercut was performed as per the report dated July 16, 2025. The construction contractor subsequently placed GAB in the undercut areas.</p> <p data-start="635" data-end="915">The subgrade beneath the curb of the deceleration lane was tested using a probe rod. Most of the subgrade was found to be firm, except for an approximate 10-to-15-foot section that appeared soft. This soft area was undercut to a depth of 4 inches and backfilled with GAB accordingly.</p> Please contact us if you have any questions regarding this report.
Upload Images
Image
Description
1
Under cut 4 inch on the existing Subgrade
2
Under cut 4 inch on the existing Subgrade
3
Under cut 4 inch on the existing Subgrade
4
Under cut 4 inch on the existing Subgrade
5
Under cut 4 inch on the existing Subgrade
6
GAB work in undercut portion of the Subgrade
7
GAB work in undercut portion of the Subgrade
8
GAB work in undercut portion of the Subgrade
9
GAB work in undercut portion of the Subgrade
10
GAB work in undercut portion of the Subgrade
11
GAB work in undercut portion of the Subgrade
12
GAB work in undercut portion of the Subgrade
13
GAB work in undercut portion of the Subgrade
14
Under Curb excavation at Deceleration lane west
15
Under Curb excavation at Deceleration lane west
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel