Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C217(Naturewalk - 7 Hills Amenities)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Our ASEC representative was on site to observe curb repairs at Seven Hills for Azalea Drive. The writer observed the contractor compact an in-place GAB section previous repaired area on 7/24/25. Also reobserved remaining curb area at right side of street probing subgrade soils with a 3/8" diameter probe rod and recommending a twelve foot section be undercut 12 inches and replaced with compacted GAB. The writer also observed repair measures followed by a concrete pour. The curb repair areas were between house numbers 302 and 276 totaling 113 feet that required replacement with a 3000 psi concrete curb mix for a total of 8 cubic yards. Also curb inlet catch basin at left side of road was observed with #4 rebar in place and was also poured. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Subgrade curb observation recommended 12" undercut
2
Curb repair recommended 12" undercut
3
Resteel observations at curb inlet catch basin
4
Compacting in place GAB
5
Concrete pour at curb repair
6
Finished curb pour
7
Concrete pour at catch basin
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel