Daily Field Report
Density test report
Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Safi Momand (Safiullah Momand)
Observations/Finding
Summary
*
Our ASEC representative was on site as requested by the contractor (Wilbanks) for the observation/testing of the placement of fill/backfill. The technician observed the contractor place 1 lift approximately 8 inches in thickness over Lots #121 through #125 and #112 through #117. Fill materials tested were found to be much higher than optimum moisture content and was left to aerate in place to reduce in-situ moistures prior to compaction. <p data-start="121" data-end="602">Our ASEC representative continued visual observation of the embankment fill activities at the project site. During the inspection, large boulders were observed within the soil material. The contractor was advised to remove these boulders from the fill area. Additionally, during the probe rod observation, certain soft spots were identified. These areas were re-compacted by the contractor prior to conducting compaction testing.</p> <p data-start="604" data-end="683">Four drive cylinder tests were performed at the following locations and depths:</p> <ul data-start="685" data-end="1042"> <li data-start="685" data-end="773"> <p data-start="687" data-end="773">At Station 22+00, the test was conducted at a depth of 3 feet to the subgrade layer.</p> </li> <li data-start="774" data-end="864"> <p data-start="776" data-end="864">At Station 20+00, the test was conducted at a depth of 7.5 feet to the subgrade layer.</p> </li> <li data-start="865" data-end="953"> <p data-start="867" data-end="953">At Station 19+00, the test was conducted at a depth of 5 feet to the subgrade layer.</p> </li> <li data-start="954" data-end="1042"> <p data-start="956" data-end="1042">At Station 18+00, the test was conducted at a depth of 6 feet to the subgrade layer.</p> </li> </ul> <p data-start="1044" data-end="1162">The equipment utilized for embankment operations included two rollers, two dozers, three trucks, and three excavators.</p> We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Soft Spots
2
Soft spots
3
Drive cylinder test
4
Drive cylinder test
5
Drive cylinder test
6
7
8
Big boulder larger than 1 feet removed from Embankment
9
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel