Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2024C217(Naturewalk - 7 Hills Amenities)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
amin.azimi@asec-na.com (Aminullah Azimi)
Observations/Finding
Summary
*
As requested, a representative from AS Engineering and Consulting (ASEC) visited the site to perform quality control inspections and testing services. Visual observation techniques were used to verify compliance with project drawings, specifications, applicable codes, and approved material submittals. Our ASEC representative performed a visual inspection for the curb in front of Lot #209 and Lot #302. It was observed that the subgrade soils beneath the curb were soft. As a corrective measure, it was recommended to undercut the area 2 feet and replace with graded aggregate base (GAB). The contractor followed this recommendation and used a hand compactor to compact the GAB material. In addition, approximately 500 feet of asphalt adjacent to the curb was identified as needing repair. It was recommended that this insufficient section be sawcut, the subbase repaired, and then re-asphalted. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel