Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Safi Momand (Safiullah Momand)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. <p data-start="69" data-end="106"><strong data-start="69" data-end="104">Drilling Work Monitoring Report</strong></p> <p data-start="108" data-end="268">On the mentioned date, the AS Engineering and Consulting LLC engineering technician was assigned to monitor drilling activities at the specified project site.</p> <p data-start="270" data-end="524">Three drilling machines were operating between manholes 4A and 5A along Road B. Drilling commenced at 08:00 AM and continued until 05:00 PM. A 3.5-inch drill bit was used for all holes. The machines worked in parallel and completed the following tasks:</p> <ul data-start="526" data-end="890"> <li data-start="526" data-end="636"> <p data-start="528" data-end="636"><strong data-start="528" data-end="548">Drill Machine 1:</strong> Drilled 48 holes, each to a depth of 15 feet, with rock encountered between 0–7 feet.</p> </li> <li data-start="637" data-end="747"> <p data-start="639" data-end="747"><strong data-start="639" data-end="659">Drill Machine 2:</strong> Drilled 49 holes, each to a depth of 15 feet, with rock encountered between 0–5 feet.</p> </li> <li data-start="748" data-end="890"> <p data-start="750" data-end="890"><strong data-start="750" data-end="770">Drill Machine 3:</strong> Drilled 9 holes, each to a depth of 22 feet, located over the hill at Lot 18, with rock encountered between 0–4 feet.</p> </li> </ul> <p data-start="892" data-end="993">The work progressed smoothly, and no significant issues were observed during the monitoring period.</p> We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Drill work in progress
2
Drill work in progress
3
Drill work in progress
4
Drill work in progress
5
Drill work in progress
6
Drill work in progress
7
Drill work in progress
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel