Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Safi Momand (Safiullah Momand)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. <p data-start="70" data-end="117"><strong data-start="70" data-end="115">Construction Activities Monitoring Report</strong></p> <p data-start="119" data-end="384">On the mentioned date, the AS Engineering and Consulting LLC engineering representative was on site to observe the construction activities in progress at the project site. The work took place from 09:30 AM until 15:30 PM and included the following activities:</p> <ul data-start="386" data-end="519"> <li data-start="455" data-end="519">Backfilling of the sewer line from 2A to 3A.</li> </ul> <strong data-start="2014" data-end="2043">1.Backfilling of the sewer line from 2A to 3A</strong> Backfill over the sewer line 2A to 3A was in progress. The ASEC technician observed the backfill activates identifying soft areas around the sewer manhole that was point out and recommended for recompaction to the backfilling crew. <p data-start="2014" data-end="2106"><strong data-start="2014" data-end="2043">2. Equipment in Operation</strong><br data-start="2043" data-end="2046" />The following machinery was used for the day’s activities:</p> <ul> <li>1 smooth drum roller</li> <li>1 small remote-controlled roller</li> </ul> <p data-start="2185" data-end="2272">The work progressed smoothly, and all activities were completed without major issues.</p> We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Sewer line Backfilling work
2
Sewer line Backfilling work
3
Sewer line Backfilling work
4
Sewer line Backfilling work
5
Sewer line Backfilling work
6
Sewer line Backfilling work
7
Sewer line Backfilling work
8
Sewer line Backfilling work
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel