Daily Field Report
Density test report
Date
*
Project Number
*
2025C216(NW (Lots) Unit 4 PH 1A & 1B )
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Safi Momand (Safiullah Momand)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. <p data-start="70" data-end="117"><strong data-start="70" data-end="115">Construction Activities Monitoring Report</strong></p> <p data-start="119" data-end="384">On the mentioned date, the AS Engineering and Consulting LLC engineering representative was on site to observe the construction activities in progress at the project site. The work took place from 10:00 AM until 15:30 PM and included the following activities:</p> <ul data-start="386" data-end="519"> <li data-start="419" data-end="454"> <p data-start="421" data-end="454">Controlled blasting at 10:00 AM between 9 and 9A.</p> </li> <li data-start="455" data-end="519"> <p data-start="457" data-end="519">Drilling for Lot#24.</p> </li> <li data-start="455" data-end="519">Excavation for Manhole 9B.</li> </ul> <p data-start="945" data-end="1319"><strong data-start="1321" data-end="1336">1. Blasting</strong><br data-start="1336" data-end="1339" />At 10:00 AM, the blasting crew successfully carried out controlled blasting for holes drilled on August 13, 2025, between Manholes 9 and 9A. Safety protocols were followed, and no incidents occurred.</p> <p data-start="1555" data-end="1778"><strong data-start="1555" data-end="1588">2. Drilling at Lot #24</strong><br data-start="1588" data-end="1591" />The drilling crew of advance explosive company worked on Lot #24, drilling holes spaced approximately 7 ft x 7 ft apart at a bit diameter of 3.5inch, continuing until 15:00 PM. The holes were randomly checked for the depth which was drilled as per the log sheet recorded by the drill operator. The drilling results were as follows.</p> <ul data-start="1780" data-end="2012"> <li data-start="1780" data-end="1847"> <p data-start="1782" data-end="1847"><strong data-start="1782" data-end="1795">Drill #1:</strong> 41 holes at the depth of 15 ft rock hitting at 0-8 ft and 3 holes at the depth of 23 ft, rock hitting 0-8 ft.</p> </li> <li data-start="1848" data-end="1915"> <p data-start="1850" data-end="1915"><strong data-start="1850" data-end="1863">Drill #2:</strong> 43 holes at the depth of 23 ft, rock hitting at 2-9 ft.</p> </li> <li data-start="1916" data-end="2012"> <p data-start="1918" data-end="2012"><strong data-start="1918" data-end="1931">Drill #3:</strong> 40 holes at the depth of 23 ft, rock hitting at 13 ft and 15 holes at the depth of 13 ft, rock hitting at 3-6 ft.</p> </li> </ul> <strong data-start="2014" data-end="2043">3. Excavation, for Manhole 9B</strong> On the mentioned date, excavation done for the manhole 9B the manhole will be installed on the next working day. <p data-start="2014" data-end="2106"><strong data-start="2014" data-end="2043">4. Equipment in Operation</strong><br data-start="2043" data-end="2046" />The following machinery was used for the day’s activities:</p> a. Drilling crew equipment <ul data-start="2107" data-end="2183"> <li data-start="2163" data-end="2183"> <p data-start="2165" data-end="2183">3 drilling machines.</p> </li> </ul> b. Sewer line crew equipment <ul> <li>1 excavator</li> </ul> <p data-start="2185" data-end="2272">The work progressed smoothly, and all activities were completed without major issues.</p> We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Blasted material at Lot#24
2
Blasted material at Lot#24
3
Blasted material at Lot#24
4
Drilling at Lot#24 and back side of Lot#24
5
Drilling at Lot#24 and back side of Lot#24
6
Excavation for Manhole#9B
7
Excavation for Manhole#9B
8
Excavation for Manhole#9B
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel