Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Safi Momand (Safiullah Momand)
Observations/Finding
Summary
*
<p data-start="298" data-end="602">As requested, an ASEC representative visited the project site from 10:00 AM to 5:00 PM to provide quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings, specifications, applicable codes, and approved material submittals.</p> <p data-start="604" data-end="857">During the site visit, three major activities were observed. At 10:00 AM, the blasting contractor carried out controlled blasting for Lot #24 for holes drilled on August 18, 2025. Safety procedures were followed, and no incidents occurred.</p> <p data-start="859" data-end="1420">Drilling operations were also carried out by Advance Explosive Company at Lot #25. Holes were drilled at approximately 7 ft by 7 ft spacing using a 3.5-inch bit. Depth checks were randomly performed and confirmed with the drill operator’s log sheet. The results showed that Drill #1 completed nine holes at a depth of 23 ft with rock encountered between 4 and 8 ft. Drill #2 completed twelve holes at a depth of 23 ft with rock encountered between 9 and 11 ft. Drill #3 completed twelve holes at a depth of 36 ft with rock encountered between 0 and 16 ft.</p> <p data-start="1422" data-end="1555">In addition, grading and slope preparation were performed behind Lots #13 and #14 to prepare the area for erosion control measures.</p> <p data-start="1557" data-end="1672">The equipment in operation for the day included three drill machines, two dozers, and blasting-related equipment.</p> <p data-start="1674" data-end="1910">We appreciate the opportunity to provide our services on this project, and if there are any questions regarding this report, please feel free to contact us.</p>
Upload Images
Image
Description
1
Blast at Lot#24
2
Blast at Lot#24
3
Grading for erosion control
4
Grading for erosion control
5
Grading for erosion control
6
Grading for erosion control
7
Drilling at lot#25
8
Drilling at lot#25
9
Drilling at lot#25
10
Drilling at lot#25
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel