Density test report
Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Safi Momand (Safiullah Momand)
Observations/Finding
Summary
*
<p data-start="145" data-end="192"><strong data-start="145" data-end="190">Construction Activities Monitoring Report</strong></p> <p data-start="194" data-end="502">As requested, an ASEC representative visited the project site from <strong data-start="261" data-end="284">10:00 AM to 5:00 PM</strong> to provide quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings, specifications, applicable codes, and approved material submittals.</p> <h3 data-start="504" data-end="527">Site Observations</h3> <p data-start="529" data-end="560"><strong data-start="529" data-end="558">Grading & Erosion Control</strong></p> <ul data-start="561" data-end="1040"> <li data-start="561" data-end="695"> <p data-start="563" data-end="695">The grading contractor was resurfacing the slope/erosion control area in preparation for greenery installation in the coming days.</p> </li> <li data-start="696" data-end="786"> <p data-start="698" data-end="786">Activities were ongoing during the morning period behind Lots #<strong data-start="760" data-end="783">7, 8, 9, 10, and 11</strong>.</p> </li> <li data-start="787" data-end="1040"> <p data-start="789" data-end="1040">The material used for grading contained debris and tree roots. ASEC recommended that such materials should not be used in the slope area. The contractor responded that the material was intended for use in the greenery area and elected to use them.</p> </li> </ul> <p data-start="1042" data-end="1063"><strong data-start="1042" data-end="1061">Embankment Fill</strong></p> <ul data-start="1064" data-end="1720"> <li data-start="1064" data-end="1147"> <p data-start="1066" data-end="1147">Embankment fill was in progress behind Lots #<strong data-start="1110" data-end="1123">15 and 16</strong> for slope preparation.</p> </li> <li data-start="1148" data-end="1231"> <p data-start="1150" data-end="1231">A compaction test was conducted, and results passed the specified project requirements.</p> </li> <li data-start="1232" data-end="1361"> <p data-start="1234" data-end="1361">The fill material contained large rocks. ASEC recommended that these rocks either be broken down or removed before placement.</p> </li> <li data-start="1363" data-end="1486"> <p data-start="1365" data-end="1486">Embankment fill was also ongoing in <strong data-start="1401" data-end="1419">Lots #17 and 18</strong>, where the final 2 ft lift to subgrade level was being prepared.</p> </li> <li data-start="1487" data-end="1595"> <p data-start="1489" data-end="1595">A compaction test was performed, and results are included in the field density section of this report.</p> </li> <li data-start="1596" data-end="1720"> <p data-start="1598" data-end="1720">Large boulders were observed in the material but were removed by the contractor as per ASEC technician’s recommendation.</p> </li> </ul> <p data-start="1722" data-end="1747"><strong data-start="1722" data-end="1745">Drilling Operations</strong></p> <ul data-start="1748" data-end="2016"> <li data-start="1748" data-end="1832"> <p data-start="1750" data-end="1832">Drilling operations were carried out by Advance Explosive Company for <strong data-start="1819" data-end="1829">Lot #25</strong>.</p> </li> <li data-start="1833" data-end="1922"> <p data-start="1835" data-end="1922">Holes were drilled at approximately <strong data-start="1871" data-end="1894">7 ft × 7 ft spacing</strong> using a <strong data-start="1903" data-end="1919">3.5-inch bit</strong>.</p> </li> <li data-start="1923" data-end="2016"> <p data-start="1925" data-end="2016">Depth checks were performed randomly and verified against the drill operator’s log sheet.</p> </li> </ul> <p data-start="2018" data-end="2040"><strong data-start="2018" data-end="2038">Drilling Results</strong></p> <ul data-start="2041" data-end="2542"> <li data-start="2041" data-end="2224"> <p data-start="2043" data-end="2224"><strong data-start="2043" data-end="2055">Drill #1</strong>: Completed six holes at 27 ft, six at 28 ft, three at 29 ft, three at 30 ft, three at 31 ft, three at 33 ft, and three at 36 ft. Rock was encountered between 3–11 ft.</p> </li> <li data-start="2225" data-end="2377"> <p data-start="2227" data-end="2377"><strong data-start="2227" data-end="2239">Drill #2</strong>: Completed eighteen holes at 23 ft, twelve at 25 ft, six at 26 ft, six at 28 ft, and six at 30 ft. Rock was encountered between 4–9 ft.</p> </li> <li data-start="2378" data-end="2542"> <p data-start="2380" data-end="2542"><strong data-start="2380" data-end="2392">Drill #3</strong>: Completed six holes at 23 ft, three at 25 ft, three at 27 ft, three at 33 ft, and twenty-one holes at 36 ft. Rock was encountered between 0–19 ft.</p> </li> </ul> <p data-start="2544" data-end="2566"><strong data-start="2544" data-end="2564">Equipment in Use</strong></p> <ul data-start="2567" data-end="2687"> <li data-start="2567" data-end="2591"> <p data-start="2569" data-end="2591">Three drill machines</p> </li> <li data-start="2592" data-end="2611"> <p data-start="2594" data-end="2611">One Roller 815K</p> </li> <li data-start="2612" data-end="2637"> <p data-start="2614" data-end="2637">One Sheep Foot Roller</p> </li> <li data-start="2638" data-end="2652"> <p data-start="2640" data-end="2652">Two Dozers</p> </li> <li data-start="2653" data-end="2668"> <p data-start="2655" data-end="2668">Four Trucks</p> </li> <li data-start="2669" data-end="2687"> <p data-start="2671" data-end="2687">Two Excavators</p> </li> </ul> <h3 data-start="2689" data-end="2705">Conclusion</h3> <p data-start="2706" data-end="2880">Overall, work progressed without major issues. ASEC recommendations regarding material quality and rock removal were addressed by the contractor.</p> <p data-start="2882" data-end="3039">We appreciate the opportunity to provide our services on this project. Should you have any questions regarding this report, please feel free to contact us.</p>
Upload Images
Image
Description
1
Grading at greenery area
2
Grading at greenery area
3
backfilling behind Lot 14 and 15
4
Grading at lot 16 and 17
5
Grading at lot 16 and 17
6
Grading at lot 16 and 17
7
Grading at lot 16 and 17
8
Grading at lot 16 and 17
9
backfilling behind Lot 14 and 15
10
Grading at lot 16 and 17
11
Testing at Lot 16 and 17
12
Testing at Lot 16 and 17
13
Grading at lot 16 and 17
14
Testing at Lot 16 and 17
15
Drill work
16
Drill work
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel