Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Safi Momand (Safiullah Momand)
Observations/Finding
Summary
*
<p data-start="196" data-end="500">As requested, an ASEC representative visited the project site from 10:00 AM to 5:00 PM to provide quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings, specifications, applicable codes, and approved material submittals.</p> <p data-start="502" data-end="1005">Backfilling of the sewer line was in progress over two to three feet of pipe between Manhole 9 and Manhole 8. Four density tests were performed during this activity, and most of the test results met the required specifications. Special instruction was provided to the use of soil containing clay and sensitive moisture contents to achieve optimum compaction. Some areas were observed to be soft, and a recommendation was given to perform additional compaction using a 10-ton capacity sheep foot roller.</p> <p data-start="1007" data-end="1184">During the afternoon, two drill machines were in operation completing the few remaining holes for Lot #25 in preparation for blasting activities scheduled for the following day.</p> <p data-start="1186" data-end="1302">The equipment operating on site for the day consisted of two drill machines, one excavator, and one 10-ton roller.</p> <p data-start="1304" data-end="1543">Overall, the work was completed without major issues. We appreciate the opportunity to provide our services on this project, and should there be any questions regarding this report, please feel free to contact us.</p>
Upload Images
Image
Description
1
Field density test between manhole 9 and 8
2
Field density test between manhole 9 and 8
3
4
Compaction around the manhole
5
Drill work at lot 25
6
Drill work at lot 25
7
Drill work at lot 25
8
Drill work at lot 25
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel