Density test report
Date
*
Project Number
*
2021C060(Suncity - Peachtree)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
On the above date, our representative was onsite was requested by the contractor for a footing inspection of lot #149 pod #14. Our representative inspected the site, and probe rodded the footing and found a low compaction area located on the front left corner of the building pad (as displayed in drawing). This area was recommended to be excavated approx. 2ft deep. This area was flagged with white flags approx. 3ft to 4ft in each direction of the footing. The rest of the footing around the building pad showed proper compaction. The site is properly prepped for concrete pour.
Upload Images
Image
Description
1
white flagged low compaction area
2
DCP results and low compaction drawing
3
lot 149 pod 14
4
probe test low compaction
5
probe test low compaction
6
DCP testing
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel