Daily Field Report
Density test report
Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Safi Momand (Safiullah Momand)
Observations/Finding
Summary
*
As requested, an ASEC representative visited the project site from 09:00 AM to 06:00 PM to provide quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings, specifications, applicable codes, and approved material submittals. The drilling work between Manhole 9A and A10 was in progress by the Advance Explosive contractor. Three drilling machines were engaged in drilling the holes. The holes were drilled at approximately 7 ft by 7 ft spacing using a 3.5-inch bit. Depth checks were randomly performed and confirmed with the drill operator’s log sheet. A total of 42 holes were drilled at a depth of 15 ft, 38 holes at a depth of 18 ft, 6 holes at a depth of 23 ft, 3 holes at a depth of 24 ft, 10 holes at a depth of 25 ft, 6 holes at a depth of 26 ft, 6 holes at a depth of 27 ft, and 8 holes at a depth of 30 ft, while the rock hitting range was 0 ft to 9 ft. The sewer line excavation and backfilling work was in progress between Manhole A5 and A6. The embankment work with rock-drilled materials was in progress in Lots #7, 8, 9, and 10, at approximate elevations of -5 ft, -8 ft, -9 ft, and -7 ft respectively. Proof-rolling was performed using an available tandem axled dump truck. It was recommended to break down larger rocks into smaller pieces using the 815K roller. In the green area and soil slopes of the lots, the soil contractor used material with amounts of topsoil. It was recommended to the soil contractor to only use suitable material (non-organic) for all types of embankments. We appreciate the opportunity to provide our services on this project, and should there be any questions regarding this report, please feel free to contact us.
Upload Images
Image
Description
1
rock drilling in progress
2
rock drilling in progress
3
rock drilling in progress
4
rock drilling in progress
5
rock drilling in progress
6
filling in green area
7
filling in green area
8
sewer line excavation
9
sewer line excavation
10
filling in green area
11
12
back filling in lot#6
13
back filling in lot#6
14
back filling in lot#6
15
Backfilling in lots
16
Backfilling in lots
17
Backfilling in lots
18
Backfilling in lots
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel