Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Safi Momand (Safiullah Momand)
Observations/Finding
Summary
*
As requested, an ASEC representative visited the project site from 09:00 AM to 05:00 PM to provide quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings, specifications, applicable codes, and approved material submittals. The blasting work between Manhole 9A and A10 was in progress by Advance Explosive contractor. The blasting material was provided by ORICA Company. An ammonium nitrate and water emulsion was used for the blasting. Between 25–125 lbs of blasting material was used in different holes. Detonators with 25 ms and 42 ms wires were used for blasting. The holes were filled with gravel as per the job specifications. All safety measures were followed, and the blast was conducted at around 2:00 PM. The sewer line backfilling work was in progress between Manhole 5 and A5. Recommendations were provided to avoid using rock diameters larger than 4 inches around the sewer pipe and manhole. The placement of layers should not exceed the allowable thickness specified in the project specifications. Compaction around the manhole was advised to be carried out using a small roller. Safety measures were implemented during excavation and backfilling. We appreciate the opportunity to provide our services on this project, and should there be any questions regarding this report, please feel free to contact us.
Upload Images
Image
Description
1
Blasting procedure
2
Blasting procedure
3
Blasting procedure
4
Blasting procedure
5
Blasting procedure
6
After blasting
7
After blasting
8
After blasting
9
After blasting
10
Back filling in lots
11
Back filling in lots
12
Sewer line
13
Sewer line
14
Sewer line
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel