Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C215(NW Unit 4 Parkway Ext. Phase 1)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Safi Momand (Safiullah Momand)
Observations/Finding
Summary
*
As requested, an ASEC representative visited the project site from 09:30 AM to 04:30 PM to provide quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings, specifications, applicable codes, and approved material submittals. The blasting contractor (Advance Explosive) had planned to blast holes between Manholes A11 and A12; however, due to the breakdown of the truck supplying explosive materials, only nine drilled holes were blasted on 04 September 2025. The remaining holes are planned to be blasted on Monday, 08 September 2025. The sewer line backfilling between Manholes A3 and A4 was in progress. The material was placed up to the natural ground level, and the embankment contractor will complete the final layers to reach the finished grade of the lots. It was noted that the lift thickness should not exceed the allowable limits specified in the project specifications. Compaction around the manhole was advised to be carried out using a small roller. Safety measures were implemented during excavation and backfilling activities. Embankment work using rock-drilled material was ongoing in Lots #11, #12, #18, and #19, targeting the final 2 ft layers. It was recommended to the embankment contractor to utilize a water truck to achieve optimum moisture content, as most of the compaction tests were failing due to low moisture contents. In addition, the embankment contractor was busy preparing the layer at road A where more fill was required from rock blast material. It was recommended to the contractor to break up the larger rock pieces to smaller allowable pieces. We appreciate the opportunity to provide our services on this project, and should there be any questions regarding this report, please feel free to contact us.
Upload Images
Image
Description
1
drilling work
2
drilling work
3
drilling work
4
Embankment work in lots
5
Embankment work in lots
6
Sewer line backfilling work
7
Sewer line backfilling work
8
embankment work in Road A
9
embankment work in Road A
10
Embankment work in lots
11
Embankment work in lots
12
Embankment work in lots
13
Embankment work in lots
14
Embankment work in lots
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel