Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C216(NW (Lots) Unit 4 PH 1A & 1B )
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Our ASEC representative was on site for the observation/testing of the placement of fill/backfill. The contractor continued to place blast material fill on roadway leading up to the bridge. The lifts were approximately 2 ft in size due to rocks being approximately 1 ft to 2 ft in diameter. As the contractor used the sheep-foot roller, it appeared to be breaking down the rock. The contractor also spreads an approximate 1 ft lift of finer material over top of the blast material to help fill voids. Our ASEC representative watched as loaded off road trucks rolled over the lifts to identify any unstable areas. There appeared to be no pumping/rutting areas in the roadway. The contractor placed larger blast rock (+2.5ft in size) in greenspace areas. The pipe crew installed SSMH B2 to SSMH B3. This area, and the pipeline for SSMH9 (roadway) was density tested, and test results were provided to the contractor. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
roadway to bridge
2
roadway
3
pipeline b
4
pipeline b
5
roadway
6
roadway
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel