Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C245(Dunkin Donuts 2025)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
<h3 data-start="641" data-end="665"><strong data-start="645" data-end="665">Purpose of Visit</strong></h3> <p data-start="666" data-end="1050">As requested, an AS Engineering and Consulting (ASEC) representative visited the site to provide <strong data-start="763" data-end="814">quality control inspection and testing services</strong> associated with the <strong data-start="835" data-end="890">placement and compaction of fill/backfill materials</strong>. Visual observation techniques were employed to verify compliance with project drawings, specifications, applicable codes, and approved materials submittals.</p> <hr data-start="1052" data-end="1055" /> <h3 data-start="1057" data-end="1083"><strong data-start="1061" data-end="1083">Field Observations</strong></h3> <p data-start="1084" data-end="1463">Density testing was performed along the <strong data-start="1124" data-end="1159">retaining wall in the pond area</strong>. Test results consistently indicated <strong data-start="1197" data-end="1222">low compaction values</strong>. In response, a <strong data-start="1239" data-end="1261">field proctor test</strong> was conducted, and a <strong data-start="1283" data-end="1297">check plug</strong> was used to verify the accuracy of the proctor data.<br data-start="1350" data-end="1353" />Mr. <strong data-start="1357" data-end="1372">Kisan Patel</strong> was present during the testing and confirmed that the field proctor results were accurate.</p> <p data-start="1465" data-end="1772">The contractor was advised of the failing density results and was <strong data-start="1531" data-end="1575">recommended to use a sheep’s foot roller</strong> to achieve the required compaction along the retaining wall area. It was further emphasized that compaction should continue until the specified density is achieved before placing subsequent lifts.</p> <hr data-start="1774" data-end="1777" /> <h3 data-start="1779" data-end="1821"><strong data-start="1783" data-end="1821">Material Concerns and Coordination</strong></h3> <p data-start="1822" data-end="1961">The <strong data-start="1826" data-end="1874">wall contractor’s crew expressed frustration</strong> regarding the material quality and compaction challenges encountered during testing.</p> <p data-start="1963" data-end="2387">At the request of <strong data-start="1981" data-end="1994">Mr. Patel</strong>, a <strong data-start="1998" data-end="2027">second laboratory proctor</strong> was performed on <strong data-start="2045" data-end="2073">stockpiled fill material</strong> from the site. The laboratory test indicated a <strong data-start="2121" data-end="2142">lower unit weight</strong> than what was specified for the retaining wall design.<br data-start="2197" data-end="2200" />Mr. Patel subsequently informed the <strong data-start="2236" data-end="2260">wall design engineer</strong> and contractor of the results, and following review, the <strong data-start="2318" data-end="2361">material was approved for continued use</strong> along the retaining wall.</p> <hr data-start="2389" data-end="2392" /> <h3 data-start="2394" data-end="2409"><strong data-start="2398" data-end="2409">Summary</strong></h3> <ul data-start="2410" data-end="2817"> <li data-start="2410" data-end="2509"> <p data-start="2412" data-end="2509">Density tests along the retaining wall indicated <strong data-start="2461" data-end="2488">insufficient compaction</strong> in multiple areas.</p> </li> <li data-start="2510" data-end="2570"> <p data-start="2512" data-end="2570">Field proctor verification confirmed test data accuracy.</p> </li> <li data-start="2571" data-end="2708"> <p data-start="2573" data-end="2708">A second lab proctor revealed a <strong data-start="2605" data-end="2631">lower material density</strong>, which was <strong data-start="2643" data-end="2663">approved for use</strong> by the design engineer after consultation.</p> </li> <li data-start="2709" data-end="2817"> <p data-start="2711" data-end="2817">ASEC provided recommendations for compaction improvement using the appropriate roller type and procedures.</p> </li> </ul> <hr data-start="2819" data-end="2822" /> <h3 data-start="2824" data-end="2842"><strong data-start="2828" data-end="2842">Conclusion</strong></h3> <p data-start="2843" data-end="3118">AS Engineering and Consulting, LLC appreciates the opportunity to provide testing and inspection services on this project. Should you have any questions regarding this report, please feel free to contact our office. We will be happy to discuss our findings in further detail.</p>
Upload Images
Image
Description
1
2
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel