Daily Field Report
Density test report
Date
*
Project Number
*
2024C217(Naturewalk - 7 Hills Amenities)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. On the above date our representative was on site to observe asphalt paving located at the east and west sides of the deceleration lanes on Seven Hills Boulevard. Placing also began at the milled area of recommended repair for the exit drive lane. The paving contractor NWGP placed 170.83 tons of 25 mm base asphalt mix. The writer observed asphalt depths along the curb lines/saw cut edge along Seven Hills blvd. The thicknesses varied from 7.0" to 7.75". The pavement depths were also observed to be measured by tape measure and contractor paving metal rod stick. It was observed having at least 4" of 25 mm base mix in place. The contractor also placed 203.29 tons, 11 loads of 19mm binder mix at the drive entrance and exit drive. The writer also observed edges being tacked with liquid asphalt. Concrete curb repairs were also observed at the drive exit lane. Recommended additional full depth milled area at exit deceleration lane on Seven Hills Boulevard in which was previously only milled 1.5". Also, at the exit lane, tapered edge subbase movement was observed possibly due to in place utilities. Recommended to check if subbase could be clipped -4" and replaced with additional 25mm base mix. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
25mm paving at east side decel.lane
2
3
Milled in sided edge at exit drive
4
Recommended area for full depth milling on Seven Hills blvd.
5
Depth checks behind paver using metal rod stick.
6
25mm paving at west side decel.lane
7
Measurement by contractor
8
Milled repaired area at exit lane showing depths of 7.25 to 7.50" outside edge and 4" inside
9
Depth checks
10
11
12
Paving 25mm at repair exit lane
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel