Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C211(Haley's Bluff - Philadelphia Rd.)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Our ASEC representative was on site for the observation/testing of the placement of fill/backfill. The contractor continued placing fill on Lots #1 through #4 in approximately 6 inch to 8 inch lifts. The lifts were compacted using an 815 sheeps-foot roller and a smaller HAMM vibrating sheep's foot roller. As the contractor works up the natural slope, they are benching out the slope approximately every 1 foot to 2 feet. ASEC performed density testing on the lots and roadway in front of the lots. All failed tests were addressed, and all test results were provided to the contractor. A field proctor was performed on the fill being excavated from the commercial lot area above the Connex (at the entrance of site). The soil appeared to be a dark red silty soil with a large amount of mica present. The remaining stockpiled topsoil was moved to the slope of the front detention pond. The topsoil was spread and rolled in along the slope using a dozer. The contractor began excavation of a new horizontal boring location by the front entrance to the site. The contractor exposed the gas main and water main by shovel and then excavated the remaining area. The boring is going under Philadelphia Road (near the entrance to the new gas station on the corner of Philadelphia and Hwy 575). We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
front detention pond
2
lot #1 area
3
boring
4
boring
5
lot #1 - #4 area
6
lot #1 - #4 area
7
front detention pond
8
lot #1 - #4 area
9
water main on Philadelphia road
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel