Date
*
Project Number
*
2025C216(NW (Lots) Unit 4 PH 1A & 1B )
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. On the above date our representative observed the grading contractor continue subgrade prep at Nature Walk Parkway between sanitary sewer manholes #4 and #9. The subgrade was undercut on an average of -2.5 ' to -3.0' below design elevation. The in-place fill subgrade soils appeared stable under truck traffic. The writer also observed RCP storm pipe installation at the bridge embankment placed between HW #B1 and manholes B1A to B1B. The writer recommended using compacting equipment on backfill at the sides and over pipe. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
Sub grade prep at Nature Walk parkway
2
3
4
RCP storm installation at bridge embankment
5
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel