Daily Field Report
Density test report
Date
*
Project Number
*
2025C211(Haley's Bluff - Philadelphia Rd.)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Our ASEC representative was on site as requested by the contractor (NG Grading) for the observation/testing of the placement of fill/backfill. Upon arrival to the site, it appears that the site has not dried out much from the previous days rainfall. There was a freeze and most of the water on the surface is now ice. ASEC spoke with the contractor to see how the contractor planned to handle this situation. The contractor insisted on working, so ASEC recommended that the frozen ground should be stripped away before any placement of fill material. The contractor agreed and spent most of the day stripping frozen ground away. As the sun came out in the afternoon, it turned the surface into mud. It was recommended to remove any over-saturated material before placement of fill. The contractor spent the remainder of the day focusing on filling the entrance to the site. The contractor expressed concerns of parking along the main roadway. They do not want to have any lawsuits due to crossing the main street with a high volume of traffic. The contractor expressed that the county has spoken to them about this situation. The focus was to fill the entrance and place rock down so all vehicles could be parked on site. The fill in this entranceway consisted of a high amount of rock (approx. 70% rock and 30% fine material as shown in pictures). ASEC attempted multiple times to density test this area but was unable to conduct density testing due to the large amount of rock present. ASEC probe rodded each lift and used visual inspection to ensure the lifts were installed correctly. ASEC watched as loaded off road trucks rolled across the lifts to check for stability. There was one area where pumping was present. ASEC informed the contractor and the contractor cut out the area until firm ground was present. Once this problem was addressed, the filled area appeared to be stable and well compacted. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
stripping mud in commercial lots
2
proof rolling the filled area at entrance
3
pumping/failed probe rod (addressed by contractor)
4
pumping/failed probe rod (addressed by contractor)
5
rocky material used for filling
6
filling entrance way by connexes
7
pumping/failed probe rod (addressed by contractor)
8
pumping/failed probe rod (addressed by contractor)
9
pumping/failed probe rod (addressed by contractor)
10
cut from failed probe rod test
11
replacing the cut area
12
site conditions at beginning of day
13
site conditions at beginning of day
14
site conditions at beginning of day
15
cutting mud/frost out before filling entrance way
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel