Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C219(Hickory Bluffs, Retaining Wall)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
mahendra.mylabathula (Mahendra Mylabathula)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. the workers continued retaining wall construction following the same procedure used on previous days. As part of the daily wall-building cycle, the crew placed two rows of concrete bricks to form each 16-inch lift. After setting the bricks, they established the required grade elevation behind each new section of wall. Once the grade was set, the crew placed the aggregate backfill and installed the plastic separation sheet. Backfilling was performed in 6-inch intervals, with the plastic cover positioned between the layers as required. This process was repeated until the full 16-inch lift height was achieved. Compaction was not performed between the 6-inch increments; instead, all compaction was completed after the full 16-inch lift was in place. Upon completion of compaction, random nuclear gauge density tests were performed at several locations, including: • Station 430 • Station 350 • Station 180 • Manhole at Station 821 • Station 80 All test results met or exceeded project compaction requirements, confirming that the contractor achieved proper density across all tested locations. In addition to lift placement, the contractor also removed additional soil behind the retaining wall to reach the required grade line needed for the geogrid installation. As of today, the required line is properly established throughout the area, ensuring readiness for upcoming grid placement. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel