Daily Field Report
Density test report
Date
*
Project Number
*
2025C211(Haley's Bluff - Philadelphia Rd.)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Our ASEC representative was on site as requested by the contractor (NG Grading) for the observation/testing of the placement of fill/backfill. Upon arrival to the site, the site appeared to be frozen from low temperatures over the previous night. The contractor spent the morning stripping away any frosted ground before placing fill. As the sun comes out at temperatures rise, the frosted ground turns into mud. The contractor focused their efforts on lots #8 - #13 and #52 - #60 area. after removal of frosted ground, the contractor began placing lifts of approx. 6in to 8in in size and compacted via sheep's foot roller. Density testing was conducted, and test results were provided to the contractor. The pipe crew began installation of pipeline in the back detention pond area. This pipeline appears to be in greenspace located along the bank and running in-between the lots. The contractor appears to be putting in a good effort to properly compact this area. Contractor spent the remainder of the afternoon slicking off the site for the scheduled rain in the forecast. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
installing AA Pipeline
2
stripping frozen dirt
3
stripping frozen ground
4
cut area above connexes at main entrance
5
compaction around AA pipeline
6
compaction around AA pipeline
7
commercial lot area
8
frozen ground commercial lots
9
frozen ground
10
back detention pond area AA pipeline install
11
AA pipeline back detention pond area
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel