Date
*
Project Number
*
2024C217(Naturewalk - 7 Hills Amenities)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
On the above date the writer was on site as requested and attended a meeting with Paulding co. members and NWGP to discuss asphalt deficiencies and repairs at east and west sides deceleration lanes. Paulding Co. made issues with in place topping mix stating that a traffic roller wasn't used during 12.5 topping mix and also stated that it appeared that a binder mix was placed instead of the required topping mix based on a gradation report and appearance showing minor surface cracking.Paulding Co. recommended to remove all 12.5 topping mix and replace.Also one section on Seven Hills Blvd. near exit lane from site was recommended to be milled 9.5" and replaced with 8.0" of class B concrete and capped with 1.5" of 12.5 topping mix. The paving contractor was informed to notify ASEC for repair placement.
Upload Images
Image
Description
1
East side decel lane showing topping mix
2
Core #4 location at east side decel lane
3
Area to be milled 9.5 "and replaced with class B concrete and topping mix
4
Area to be milled 9.5"
5
Showing surface cracking at decel lane east side
6
Showing west side decel lane to be milled and replace topping
7
8
showing surface cracking at east side decel lane
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel