Daily Field Report
Density test report
Date
*
Project Number
*
2025C260(NW (PHASE 2) Parkway Extension)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
clyde.smith (Clyde Smith)
Observations/Finding
Summary
*
On the above date the writer was on site as requested and observed the grading contractor continue placing rock fill at slope embankment in compacted lifts using a dozer to spread and a sheet foot vibratory roller for compacting.The fill was placed in accordance with recommendations and appeared suitable for compaction requirements .
Upload Images
Image
Description
1
Undercutting rock fill from Nature Walk Parkway near sanitary sewer manhole #9
2
3
Fill placement at slope embankment
4
Wet conditions at haul road to slope embankment
5
Fill placement at slope embankment
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel