Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C211(Haley's Bluff - Philadelphia Rd.)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Our ASEC representative was on site as requested by the contractor (NG Grading) for the observation/testing of the placement of fill/backfill. The contractor continued placing lifts of approx. 1ft to 1.5ft in size across the commercial lots located by front detention pond. ASEC discussed the lift size with the contractor and expressed concerns of potential low compaction results due to lifts being installed too thick. The contractor requested to test the area first before they change lift size. ASEC agreed and conducted density testing. All test results were provided to the contractor. The contractor continued placing lifts of approx. 6in to 8in across the lots #8 - #13 and #52 - #60 area. Density testing was conducted, and all test results were provided to the contractor. ASEC watched as loaded trucks rolled across the lifts to check for stability. There were no signs of pumping or cracking present, and the lift appears to be stable. The pipe crew installed BA2 - BA5. Density testing will be conducted when they backfill approx. +2ft above pipeline. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
BA Pipeline
2
BA Pipeline
3
8 - 13 and 52 - 60
4
8 - 13 and 52 - 60 area
5
commercial lot area
6
8 - 13 and 52 - 60
7
cut area above 8 - 13 and 52 - 60
1
Add Row
Post Status custom
Validate Email
Visual
Text
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel