Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C269(Main St. & First Ave. - Mixed-use)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
Samara Kandi (Samara Simha Reddy Kandi)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. <p data-start="376" data-end="947">On the next working day, construction activities continued at Pond 1, non-woven geotextile fabric was placed along the bottom and sides of the excavation, following fabric placement, a gravel bedding layer was installed and leveled.</p> <p data-start="949" data-end="1569">The crew then installed corrugated metal pipes (CMP) in alignment with the existing detention system. Pipe installation at Pond 1 progressed to an approximate total length of 140 lineal feet. After installation, gravel was placed around and between the pipes. The open ends of the detention pipes were closed and wrapped with geotextile fabric to prevent soil intrusion and to protect the system prior to final backfilling.</p> <p data-start="1571" data-end="2031">At Pond 3, work focused on backfilling operations following completion of the detention system. Suitable fill material was placed around the pipes in controlled lifts of approximately 6 to 8 inches. Each lift was compacted using a sheep-foot roller, and backfilling continued to an approximate height of 3 feet on sides of the pipe system. Compaction was observed to be uniform, and the fill was compacted thoroughly to achieve the required density.</p> <p data-start="2033" data-end="2394">At Pond 2, backfilling activities were initiated. Fill material was placed to an approximate height of 1 foot in a single lift and compacted. However, compaction did not meet the required density, and the area failed compaction requirements. As a result, backfilling operations at Pond 2 were temporarily stopped pending corrective measures.</p> <p data-start="2396" data-end="2793">Following pond-related activities, the crew shifted operations at foundation wall to sd2-p 912. Fill material was placed to restore grades and compacted in two controlled lifts, each approximately 6 to 8 inches thick. Compaction was performed using compaction equipment, and the area was graded.</p> We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
2
3
4
5
6
7
8
9
10
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel