Density test report
Date
*
Project Number
*
2025C211(Haley's Bluff - Philadelphia Rd.)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day. Our ASEC representative was on site to observe the contractor (NG Grading) and for the observation/testing of the placement of fill/backfill. The contractor continued placing soil lifts of approximate 8 to 12 inches in size across Lots #14 through #19. Lifts were compacted via a sheep-foot roller. ASEC watched as loaded off road trucks rolled across the lifts to check for stability. There were no signs of severe pumping or deflection present. Density testing was performed, and test results were provided to the contractor. Due to multiple attempts to compact a lift and still receiving failing tests, ASEC recommended to roll in the lift with a loaded off-road truck. Density testing passed once the lift was rolled in. The wall crew began addressing the footing. It was ASEC recommendation to undercut approximately 5 feet deep by 8 feet wide and approximately 50 feet in length of the footing along the face of the wall. This area had low bearing capacity and did not achieve the required bearing capacity of the wall. It was recommended to place geogrid in the bottom of the footing, and then to place approximately 2 to 3 feet of No. 57 stone and then cap the 57 stone with approximately 6 to 12 inches of GAB. The GAB was damped with water and compacted with a trench roller. The wall crew then began to place their baskets and install the wall. ASEC performed density testing, and test results were provided to the contractor. Any failing tests were addressed and retested. The pipe crew is boring under Philadelphia Road to install a sewer line. No testing was requested/performed at this time. We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Upload Images
Image
Description
1
organics in fill
2
organics in fill
3
wall 3
4
wall 3
5
slope along wall
6
footing wall 3
7
footing wall 3
8
gab cap in footing
9
gad cap in footing
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel