Skip to content
Menu
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Login
Home
About
Daily Field Report
Density Test Report
Concrete Test Report
Home
Daily Field Report
Density test report
Date
*
Project Number
*
2025C281(Owen Mills - Owens Store Rd)
Name of the Project
*
Project Location
Client Company
*
Weather
Arrival Date
Arrival Time
Departure Date
Departure Time
Onsite Hours
ASEC Technician Name
sean.willett (Sean Willett)
Observations/Finding
Summary
*
<h3 data-start="622" data-end="644">FIELD OBSERVATIONS</h3> <p data-start="646" data-end="933">On the above date, an AS Engineering and Consulting, LLC (ASEC) representative visited the site at the contractor’s request to <strong data-start="773" data-end="841">observe earthwork operations and perform quality control testing</strong> in accordance with the project drawings, specifications, and approved materials submittals.</p> <p data-start="935" data-end="1175">The contractor was completing the <strong data-start="969" data-end="1017">final approximately 2 feet of fill placement</strong> along the <strong data-start="1028" data-end="1078">dam embankment located at the rear of the site</strong>. Fill was placed in <strong data-start="1099" data-end="1130">approximately 12-inch lifts</strong> and compacted using a <strong data-start="1153" data-end="1174">sheepsfoot roller</strong>.</p> <p data-start="1177" data-end="1465">Field <strong data-start="1183" data-end="1211">in-place density testing</strong> was conducted along the dam embankment. Fill performance was further evaluated by <strong data-start="1294" data-end="1355">observing loaded off-road haul trucks traversing the lift</strong>, which served as proofrolling. <strong data-start="1387" data-end="1427">No pumping, cracking, or instability</strong> was observed during these activities.</p> <p data-start="1467" data-end="1702">Following completion of the fill placement, the contractor proceeded with <strong data-start="1541" data-end="1594">topsoil placement in designated green space areas</strong> and implemented <strong data-start="1611" data-end="1640">rain preparation measures</strong> in anticipation of forecasted precipitation later in the day.</p>
Upload Images
Image
Description
1
dam
2
cut
3
cut
1
Add Row
Post Status custom
Validate Email
Visual
Code
Insert/edit link
Close
Enter the destination URL
URL
Link Text
Open link in a new tab
Or link to existing content
Search
No search term specified. Showing recent items.
Search or use up and down arrow keys to select an item.
Cancel